Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 27 made on Tuesday October 23, 2018 at 10:22
Techsquad
Long Time Member
Joined:
Posts:
August 2010
355
On October 23, 2018 at 09:21, buzz said...
A couple of those videos are misleading and might be scary. How much lead time do you have? If you are near a local Clearline rep, I'm sure that they will be able to offer some training and build your confidence. Allocate a couple hours if you are a slow learner.

If you decide to use prefabricated cables, have the local site people pull a cloth tape through the conduit. These tapes are calibrated and you'll be able to know the exact length of prefab cable needed. This is how the FIOS installers handle the drop in conduit. An outside team prepares everything and pulls the tape. The inside crew knows which optical cable to bring, then uses the pull tape for plug and play.

They actually ran cat-6 already, and the length markings on the cable itself can tell us the exact length. it's a 200 meter straight shot with a few J-boxes in the middle. should be pretty easy to use the exisiting cat-6 and pull the fiber ( i guess )


Hosting Services by ipHouse