On October 22, 2018 at 15:06, Techsquad said...
very good point. I thought about that... however this is actually a big house and a remote guest house, I asked the developer and all the power from Guest house comes from the main panel (same phase ) of the main house. i am studying the possibility of replacing copper to fiber... but i think its not going to be feasible =(
I just ran the numbers for my job. Even if I use the premade stuff that was linked in a post it only comes out to 77 cents a foot it is still very feasible. (2 strand LC connectors)
I’ve done clearline before but have yet to connect two outbuildings with it. I think I’m just going to go the route of premade fiber for this one!