Post 24 made on Saturday November 23, 2002 at 03:49 |
Brent Southam Founding Member |
Joined: Posts: | December 2001 352 |
|
|
For us we T+M everything, even new construction. It could be because we don't really have an outside salesman (to actually prepare a bid) or it could be that my boss is a cheap and doesn't want to ever miss a penny that he could have billed a client for. He'll put down every F-connector, every inch of IR wire, every nail on box. I mean cheap.
|
|
|