Post 16 made on Saturday December 10, 2005 at 18:22 |
Larry Fine Loyal Member |
Joined: Posts: | August 2001 5,002 |
|
|
Can, the simplest way to tell the electrician what you want is to ask for a single-gang box in the ceiling, and one where the equipment will go, and to run a 14-2 between them.
I suggest placing the latter near the stack's supplying receptacle box, even on the opposite side of the same stud, but mention to him to not use one 2-gang box for both devices.
Remind him that this needs to be an isolated run of Romex, and not to add any other wires to either box, unless you see a need for a second power feed, like to a screen motor, etc.
Believe it or not, we haven't had a chance to use the extension yet. Soon, though.
|
|
|
|