Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 19 made on Sunday June 10, 2018 at 18:56
highfigh
Loyal Member
Joined:
Posts:
September 2004
8,322
If a cabinetmaker doesn't know that they need to ask questions, they should do something else. I told him I needed room to move the equipment in order to make the connections, that the connections shouldn't be cramped at the rear and that I would like holes cut in the back panel, at specific places. Didn't get the holes, either. "This turd said I should be able to have it here by the first week of December". That was in October and it finally arrived in late April, but it needed to be painted and that took six freaking weeks.

I could see your point if the guy had received dimensions from us, but he saw, touched and measured the GD equipment! It's as if he has never done anything with this stuff.

Clearly. It's an adverb and I told him, clearly, what I needed. I got none of it. No recessed back to allow space for the cabling, no holes to pass them through. Then, he drilled the holes for the shelf pins about an inch from the front and rear, which makes sliding the shelf forward a big problem. Oh, and I also asked for a U-shaped cutout at the rear edge of the shelves, to allow the cables to pass between levels. Nope. He even wrote something on his pad as I spoke, but it may not have been what I was saying. I think he was playing Hangman, or something.

Bold type isn't shouting, ALL CAPITOL LETTERS IS SHOUTING! I would think you would know that by now. I answered your comments separately and immediately below to make it easier to read, rather than use the same font, size and color. Was that not clear?
My mechanic told me, "I couldn't repair your brakes, so I made your horn louder."


Hosting Services by ipHouse