Post 75 made on Wednesday December 25, 2002 at 12:30 |
sndtowne Long Time Member |
Joined: Posts: | December 2002 24 |
|
|
Hi Thon,
You are right. Most of the time on larger jobs, we require a 1/3 deposit on acceptance of the proposal, with prewire billed against that. The job I referred to above was only a $2500.00 job. I had spent more time demonstrating and educating than it took me to type the proposal. We can't stand any hassels with a job that small.
|
|
|