Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 29 made on Tuesday October 5, 2004 at 10:32
Atik Rat 81
Founding Member
Joined:
Posts:
April 2002
35
I know it's a different thread, but how many of you are benching and burning everything coming thru your warehouses. We recently (3 months) made that policy, and it is now one of my many jobs. In my setup area, I have dedicated power, 2 sat feeds, cable, network and phone. I have 2 empty 43space racks w/shelves for burning equipment, and 5 speakers wired to the ceiling for full SS testing. Anything you guys may have in place that I'm not thinking of or any tips ie. length of time to considered "burned in". the sales staff is making a real effort to include some form of a Middle Atlantic rack in every job. We are building, programming and testing these racks in shop, now, including wiring flashers inside non-rs232 controlled components, or pieces with IR jacks on the back. Any hints would be appreciated, as we have recently been "acquired" by SMG (Signature Media Group), and I need all the productivity I can get!! Thanks.


Hosting Services by ipHouse