Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 12 made on Monday February 14, 2005 at 21:39
Larry Fine
Loyal Member
Joined:
Posts:
August 2001
5,002
Okay, here's a rough drawing:



Note that this is an overhead view, the room is toward the bottom, and the floating rectangle is the section of drywall removed for access, and to be reinstalled.

I'd suggest that six screws per sistered stud are plenty: two at the top, two at the bottom, and two near the middle. Two in each place so the sistered pieces can't twist.

Plus, I just noticed that the second and fourth screws pointing up should be shifted to the right a bit, so they engage the studs and the 2x4s.


Hosting Services by ipHouse