On June 26, 2006 at 22:48, Larry Fine said...
To be fair to the under-equipped guy, I'm willing
to bet you that he had a few more holes to drill
and wires to run than you did. Having done plenty
of both power and LV wiring, I can say that power
wiring is by far more labor-intensive.
Yeah you are right. Both of us had to take all of our runs up and over a 30' high ceiling. Even the alarm guys were complaining about the crazy design. I did a 6k sq ft house in the same time I did this ski lodge looking hunting lodge. Sparky had to run wires in some places I would have never climbed.
I am not knocking him at all but in the time he drilled 1 hole and hit a nail and then started over I drilled 3 holes.
I guess I am still excited about my new toy!