Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 58 made on Friday June 29, 2007 at 16:43
oex
Super Member
Joined:
Posts:
April 2004
4,177
On June 29, 2007 at 10:19, simoneales said...
It was difficult, yes.
I had to mark out all the shelf positions and then remove
them. Prepare all the cables to length, attach a cable
tie to the wall behind each piece of equipment and attach
all the wiring to the wall as one big loom. Then i put
each shelf back in with all the wiring for that device
resting on top. Then i could install the gear. A lot of
work but very neat cables.

Simon.

You need to, on jobs like thins, quote with rack and without. Typically showing 12 extra hours of labor and and extra $300 for longer cables will be enough to swithc them to the rack.
Diplomacy is the art of saying hire a pro without actually saying hire a pro


Hosting Services by ipHouse