floor:

Value: Layer of 3/4 underlayment with Serena underlayment then 3/4" T&G plywood then flooring

Next level: Add another layer of 3/4" T&G with green glue between them.

Ceiling:
Bang for the buck: use 2 layers of 5/8" drywall.

Next level: add a layer of green glue between the sheet rock

Next level: above but isolation clips and resilient channel

Ultimate: build room within a room construction.

HVAC: flexible ducts if possible with liners. Or liners for metal ducts. Wrap metal ducts in mass load vinyl.