Post 1 made on Wednesday March 28, 2018 at 11:27 |
1234tech Long Time Member |
Joined: Posts: | January 2007 140 |
|
|
My experience connecting separate buildings with underground copper has been riddled with electrical surge and grounding issues.
Anyone have a go-to for 4 strand OM3 direct burial?
I will still use conduit but still prefer to use DB grade cabling inside the conduit with experiences of conduit failures through the construction process.
|
|
|