Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 8 made on Tuesday September 12, 2017 at 01:27
Mac Burks (39)
Elite Member
Joined:
Posts:
May 2007
17,518
For us cable certification is part of the project. It happens before drywall to catch any mistakes we made and after drywall to catch any mistakes they make.

In 20 years we have had maybe 3 projects with 1 bad wire each. Nothing we couldn't work around with extra cable or conduit. I have had plenty of situations where wires got cut short by drywall or cabinet installers. Having the two step testing covers us and we dont have to eat the additional expense of working around it.
Avid Stamp Collector - I really love 39 Cent Stamps


Hosting Services by ipHouse