Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 7 made on Monday May 29, 2017 at 07:33
jgordonLEDS
Long Time Member
Joined:
Posts:
August 2006
15
On May 29, 2017 at 03:19, ErikU said...
How are you supposed to pre-wire without a design and/or specification?

Excellent question. There are many ways to design a conference room, depending on requirements, budget, etc. It might be possible to put enough pre-wire in to account for everything, but it's not nearly as efficient as designing it first.

Also, if the room will have a drop ceiling and framed walls (assuming normal commercial construction with metal studs), with the exception of AC power to the projector(s), displays(s), and screen(s), it's possible (and common) to do all the wiring after the room is built.

Joe Gordon


Hosting Services by ipHouse