Post 2 made on Wednesday December 21, 2016 at 12:40 |
King of typos Loyal Member |
Joined: Posts: | June 2002 5,281 |
|
|
As an electrician, I would be worried about a lag bolt punching into that conduit.
If you can, remove that plywood and put a piece of metal of sorts to protect the coduit. Then put the plywood back. I only say to remove it, because you'll want to make sure theirs no bulg under the Sheetrock.
KOT
|
|
|