Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 6 made on Tuesday September 27, 2016 at 13:00
cshepard
Advanced Member
Joined:
Posts:
June 2008
767
Basically the drywall gets screwed into vertical strips of plastic which are roughly 1/2-3/4" under the surface of styrofoam. Then it's a few inches of the foam before you hit concrete. There's no void for a toggler anchor to "open up".
Chris


Hosting Services by ipHouse