Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 16 made on Friday October 30, 2015 at 01:17
Mac Burks (39)
Elite Member
Joined:
Posts:
May 2007
17,519
On October 29, 2015 at 22:24, rad doc said...
True but not as fun!
Very dated.
We do have a few iPads around. There are only 3 LC1000's so not too bad to replace.

Really just local control in the home theater with the basics-AVR, DTV, bluray, apple tv and gaming system. Whole home audio with 8 zones (have a PAD8a now)

You got it. Sorry if I wasn't clear. Have to use the iPad to turn on lights, not terrible but not super convenient either.

Yes but I would probably need to add infinet receiver, though not expensive.

No, it does control theater currently. Yes, the pool is controlled via rs-232 adapter.

Nothing more complicated. No video distribution.

True but I would assume much less than Crestron.

Okay so sounds like you have/want...

Home Theater with typical sources AVR or separates & a few lighting loads with at least 1 keypad to control them.

8 zones of audio with a Sonos or similar for streaming music.

3 in-wall locations for controlling audio and subsystems (pool/security & might as well do HVAC)

This is definitely an in-the-box control4 system. Here are a couple of things to think about in terms of cost difference.

1. If the Pad8a is working i think you can continue using it with 3 Series processors. Dont quote me on that :)

2. If you stick with Crestron you don't need to replace the lighting hardware you already have.

You would need to buy: (assuming the PAD8A can stay)

1 MC3 Processor
3 In-wall Touchpanels (or a mix of touchpanels and keypads to lower cost)
1 Wired lighting keypad if you can get cresnet wire to it or a wireless keypad
1 Autonomics Mirage MMS-2A

With hardware and programming and labor i think you are looking at a $15-20k Crestron upgrade assuming you have wire everywhere or can get wire everywhere and there are no surprises. A firm with their act together should need a day for discovery, a day to pull any wire and remove old hardware, 2 days for installation and 2 days to configure and load/test programming. I have a big jump there ($5000) because i don't know how much work it will actually take to do the installation. They may only spend 1 day doing discover and rewiring. They may need to have 2 guys on site for programming & testing. Who knows. Doesn't hurt to get quotes from two companies.
Avid Stamp Collector - I really love 39 Cent Stamps


Hosting Services by ipHouse