On July 27, 2014 at 01:05, Dave in Balto said...
No way is this up to code. And no it technically should not be done. And no low voltage contractor for the point of saying it should ever install a power outlet when he finds out that he needs one some where.
Dave, are you saying that running line and low voltage wires next to each other is not up to code, the fact that running them so close to surface (just behind crown molding), or something else?
I get why we shouldn't run line and low voltage close to each other, but where in NEC does it say that we can't?