Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 7 made on Sunday July 27, 2014 at 01:35
para19
Long Time Member
Joined:
Posts:
December 2012
124
You could cut out a 2-3 inch strip in the drywall that will be covered by the crown moulding. Then drill holes through the studs and run your wiring through the studs and the electrician can run his wire along the surface if he wants. I imagine that BX would cut down on any possible interference vs. NMD (Lomex). CEC Code states at least 2" separation between LV and HV.
There is always money in the banana stand...


Hosting Services by ipHouse