You could cut out a 2-3 inch strip in the drywall that will be covered by the crown moulding. Then drill holes through the studs and run your wiring through the studs and the electrician can run his wire along the surface if he wants. I imagine that BX would cut down on any possible interference vs. NMD (Lomex). CEC Code states at least 2" separation between LV and HV.