Your Universal Remote Control Center
RemoteCentral.com
Custom Installers' Lounge Forum - View Post
Up level
Up level
The following page was printed from RemoteCentral.com:

Login:
Pass:
 
 

Original thread:
Post 9 made on Friday February 24, 2012 at 21:27
Trunk-Slammer -Supreme
Loyal Member
Joined:
Posts:
November 2003
7,462
On February 24, 2012 at 10:29, drewski300 said...
Either use washers or 1/2 nipples or 1/2 threaded pipe cut to size.

Just did one last week and used large flat washers behind each lag bolt.


Had to chisel out one of the stones so I could run the electrical and cabling first, which allowed for determining what was behind the stone. Lucky for me this one was plywood, but I have seen the stone (both real and faux) on OSB and sheetrock.


I've used metal pipe to sleeve the lags, but using washers seems to work equally well if not better.


Hint: Measure for the stack of washers, stack them up and then use some tape to hold them together to make it easier to put them into position. Remove tape after they're in position and do some paint touch up if they show at all.


Hosting Services by ipHouse